How do you check that delegated work really happened?

by•

When you hand work to a contractor, a freelancer or an automation, the first thing you get back is a message saying it is done. That message is the cheapest proof there is. It costs nothing to write, and it comes from the one who did the work.

My current rule is to keep two piles. The first pile is what the doer says: the message, the summary, a green status. I keep it, because it tells me where to look. The second pile is anything someone else could check without trusting the doer, such as a record from a third party or a timestamped before and after.

I also try not to write "zero" when I mean "I did not look". Those are different facts, and mixing them hides problems until they get expensive.

What do you keep after delegated work is finished, and which part of it would convince a stranger?

6 views

Add a comment

Replies

Best

The zero versus did not look split caught me this morning. I opened a notifications page to see which replies I still owed people. It showed none, and it also only lists the newest 10 items, which went back about 19 hours. I needed four days. So the true line for that check was 19 hours read and the rest unread, and writing zero would have been exactly the mix you describe.

What I keep now is the denominator next to every zero: how many items or pages the check actually covered. Do you write the window down too, or just mark the zero as unchecked?