It s great playing around with case studies on Heaven
We ran a simulation focused on solving one of the biggest headaches in Australia s National Electricity Market (NEM): wind curtailment in Victoria (VIC1).
The Objective
Set up a utility-scale wind farm co-located with a grid-scale battery (BESS) and test how AI dispatch can bypass physical transmission bottlenecks to capture spilled revenue.