I ve noticed a pattern with Lovable builds. Early on everything feels fast, then there s a moment where the project gets fragile and you stop wanting to touch it.
Where does that moment show up for you?
What was the first thing that made it feel unsafe to change?
I m collecting real examples so I can focus on the right problems next.
Most Lovable workflows start by generating a chaotic first draft, then spending credits fixing drift. This flips the order: you generate a structured website draft first (layout, sections, basic SEO scaffolding), then open Lovable to build from something stable